{"id":16671,"date":"2023-03-29T22:01:43","date_gmt":"2023-03-29T19:01:43","guid":{"rendered":"https:\/\/esi.edu.sa\/?post_type=courses&#038;p=16671"},"modified":"2026-05-07T06:44:53","modified_gmt":"2026-05-07T03:44:53","slug":"bim4","status":"publish","type":"courses","link":"https:\/\/esi.edu.sa\/en\/courses\/bim4\/","title":{"rendered":"BIM Level 4 \/ Management"},"content":{"rendered":"<div class=\"container\">\n<div id=\"model-response-message-contentr_6b109fc9aef266ad\" class=\"markdown markdown-main-panel enable-updated-hr-color\" dir=\"ltr\" aria-live=\"polite\" aria-busy=\"false\">\n<h2 data-path-to-node=\"2\">\ud83c\udfd7\ufe0f <b data-path-to-node=\"2\" data-index-in-node=\"4\">BIM Management &amp; International Standards<\/b><\/h2>\n<h3 data-path-to-node=\"3\"><b data-path-to-node=\"3\" data-index-in-node=\"0\">\ud83c\udfaf General Objective<\/b><\/h3>\n<p data-path-to-node=\"4\">This level aims to qualify the trainee to transition from a BIM user to a <b data-path-to-node=\"4\" data-index-in-node=\"74\">BIM Coordinator \/ BIM Manager<\/b>. This is achieved by understanding and applying international standards such as <b data-path-to-node=\"4\" data-index-in-node=\"184\">PAS 1192<\/b> and <b data-path-to-node=\"4\" data-index-in-node=\"197\">ISO 19650<\/b>, and implementing BIM methodology across all project stages (<b data-path-to-node=\"4\" data-index-in-node=\"268\">Design \u2013 Construction \u2013 Facility Management<\/b>) in accordance with global best practices.<\/p>\n<hr data-path-to-node=\"5\" \/>\n<h3 data-path-to-node=\"6\"><b data-path-to-node=\"6\" data-index-in-node=\"0\">\ud83d\udcda Training Modules<\/b><\/h3>\n<h4 data-path-to-node=\"7\"><b data-path-to-node=\"7\" data-index-in-node=\"0\">\ud83d\udd39 INTRODUCTION TO BIM MANAGEMENT<\/b><\/h4>\n<ul data-path-to-node=\"8\">\n<li>\n<p data-path-to-node=\"8,0,0\">Distinguishing between <b data-path-to-node=\"8,0,0\" data-index-in-node=\"23\">BIM Modeler \/ Coordinator \/ Manager<\/b>.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"8,1,0\">The role of the BIM Manager within a project.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"8,2,0\"><b data-path-to-node=\"8,2,0\" data-index-in-node=\"0\">Information Management<\/b> vs. <b data-path-to-node=\"8,2,0\" data-index-in-node=\"27\">Model Management<\/b>.<\/p>\n<\/li>\n<\/ul>\n<h4 data-path-to-node=\"9\"><b data-path-to-node=\"9\" data-index-in-node=\"0\">\ud83d\udd39 BIM STANDARDS &amp; CODES<\/b><\/h4>\n<ul data-path-to-node=\"10\">\n<li>\n<p data-path-to-node=\"10,0,0\">Introduction to the <b data-path-to-node=\"10,0,0\" data-index-in-node=\"20\">PAS 1192<\/b> series.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"10,1,0\">In-depth explanation of the <b data-path-to-node=\"10,1,0\" data-index-in-node=\"28\">ISO 19650<\/b> standard.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"10,2,0\"><b data-path-to-node=\"10,2,0\" data-index-in-node=\"0\">Key Concepts:<\/b><\/p>\n<ul data-path-to-node=\"10,2,1\">\n<li>\n<p data-path-to-node=\"10,2,1,0,0\">Information Management.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"10,2,1,1,0\"><b data-path-to-node=\"10,2,1,1,0\" data-index-in-node=\"0\">CDE<\/b> (Common Data Environment).<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"10,2,1,2,0\">Naming Conventions.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"10,2,1,3,0\">Revision Control.<\/p>\n<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h4 data-path-to-node=\"11\"><b data-path-to-node=\"11\" data-index-in-node=\"0\">\ud83d\udd39 COMMON DATA ENVIRONMENT (CDE)<\/b><\/h4>\n<ul data-path-to-node=\"12\">\n<li>\n<p data-path-to-node=\"12,0,0\">The concept of a Common Data Environment.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"12,1,0\">File status codes (<b data-path-to-node=\"12,1,0\" data-index-in-node=\"19\">WIP \/ Shared \/ Published \/ Archived<\/b>).<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"12,2,0\">Permission and access management.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"12,3,0\">Collaboration platforms such as <b data-path-to-node=\"12,3,0\" data-index-in-node=\"32\">Autodesk BIM 360<\/b> and <b data-path-to-node=\"12,3,0\" data-index-in-node=\"53\">Autodesk Construction Cloud<\/b>.<\/p>\n<\/li>\n<\/ul>\n<h4 data-path-to-node=\"13\"><b data-path-to-node=\"13\" data-index-in-node=\"0\">\ud83d\udd39 BIM EXECUTION PLAN (BEP)<\/b><\/h4>\n<ul data-path-to-node=\"14\">\n<li>\n<p data-path-to-node=\"14,0,0\">Developing the <b data-path-to-node=\"14,0,0\" data-index-in-node=\"15\">Pre-Contract BEP<\/b>.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"14,1,0\">Developing the <b data-path-to-node=\"14,1,0\" data-index-in-node=\"15\">Post-Contract BEP<\/b>.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"14,2,0\">Defining roles and responsibilities.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"14,3,0\">Establishing the Data Exchange Plan.<\/p>\n<\/li>\n<\/ul>\n<h4 data-path-to-node=\"15\"><b data-path-to-node=\"15\" data-index-in-node=\"0\">\ud83d\udd39 BIM IN PROJECT LIFECYCLE<\/b><\/h4>\n<ul data-path-to-node=\"16\">\n<li>\n<p data-path-to-node=\"16,0,0\">Applying BIM in the Design Phase.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"16,1,0\">Applying BIM in the Construction Phase.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"16,2,0\">Applying BIM in the <b data-path-to-node=\"16,2,0\" data-index-in-node=\"20\">Operations &amp; Maintenance (Facility Management)<\/b> phase.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"16,3,0\">Linking BIM with <b data-path-to-node=\"16,3,0\" data-index-in-node=\"17\">4D (Scheduling)<\/b> and <b data-path-to-node=\"16,3,0\" data-index-in-node=\"37\">5D (Cost Estimating)<\/b>.<\/p>\n<\/li>\n<\/ul>\n<h4 data-path-to-node=\"17\"><b data-path-to-node=\"17\" data-index-in-node=\"0\">\ud83d\udd39 BIM CONTRACTS &amp; LEGAL ASPECTS<\/b><\/h4>\n<ul data-path-to-node=\"18\">\n<li>\n<p data-path-to-node=\"18,0,0\">Incoporating BIM into contracts.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"18,1,0\">Parties&#8217; responsibilities and liabilities.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"18,2,0\">Risk Management.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"18,3,0\"><b data-path-to-node=\"18,3,0\" data-index-in-node=\"0\">Intellectual Property &amp; Data Ownership<\/b>.<\/p>\n<\/li>\n<\/ul>\n<h4 data-path-to-node=\"19\"><b data-path-to-node=\"19\" data-index-in-node=\"0\">\ud83d\udd39 FILE NAMING &amp; DATA STRUCTURE<\/b><\/h4>\n<ul data-path-to-node=\"20\">\n<li>\n<p data-path-to-node=\"20,0,0\">File naming systems according to <b data-path-to-node=\"20,0,0\" data-index-in-node=\"33\">ISO 19650<\/b>.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"20,1,0\">Folder structure and organization.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"20,2,0\">Project codes \u2013 Disciplines \u2013 Revisions.<\/p>\n<\/li>\n<\/ul>\n<h4 data-path-to-node=\"21\"><b data-path-to-node=\"21\" data-index-in-node=\"0\">\ud83d\udd39 COORDINATION &amp; REVIEW MANAGEMENT<\/b><\/h4>\n<ul data-path-to-node=\"22\">\n<li>\n<p data-path-to-node=\"22,0,0\">Managing coordination meetings.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"22,1,0\">Generating <b data-path-to-node=\"22,1,0\" data-index-in-node=\"11\">Clash Detection<\/b> reports.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"22,2,0\">Tracking versions and updates.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"22,3,0\">Using tools like <b data-path-to-node=\"22,3,0\" data-index-in-node=\"17\">Navisworks Manage<\/b>.<\/p>\n<\/li>\n<\/ul>\n<h4 data-path-to-node=\"23\"><b data-path-to-node=\"23\" data-index-in-node=\"0\">\ud83d\udd39 BIM DELIVERABLES &amp; HANDOVER<\/b><\/h4>\n<ul data-path-to-node=\"24\">\n<li>\n<p data-path-to-node=\"24,0,0\">Defining project deliverables (<b data-path-to-node=\"24,0,0\" data-index-in-node=\"31\">Models \/ Drawings \/ Data<\/b>).<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"24,1,0\">Preparing <b data-path-to-node=\"24,1,0\" data-index-in-node=\"10\">IFC<\/b> files.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"24,2,0\">Project handover to the owner.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"24,3,0\">Linking BIM with <b data-path-to-node=\"24,3,0\" data-index-in-node=\"17\">Asset Management<\/b> systems.<\/p>\n<\/li>\n<\/ul>\n<hr data-path-to-node=\"25\" \/>\n<h3 data-path-to-node=\"26\"><b data-path-to-node=\"26\" data-index-in-node=\"0\">\ud83d\udcc5 Training Duration<\/b><\/h3>\n<ul data-path-to-node=\"27\">\n<li>\n<p data-path-to-node=\"27,0,0\"><b data-path-to-node=\"27,0,0\" data-index-in-node=\"0\">5 Days<\/b><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"27,1,0\"><b data-path-to-node=\"27,1,0\" data-index-in-node=\"0\">4 Hours daily<\/b><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"27,2,0\"><b data-path-to-node=\"27,2,0\" data-index-in-node=\"0\">Total:<\/b> 20 hours of intensive training.<\/p>\n<\/li>\n<\/ul>\n<hr data-path-to-node=\"28\" \/>\n<h3 data-path-to-node=\"29\"><b data-path-to-node=\"29\" data-index-in-node=\"0\">\ud83c\udfaf Course Outcomes<\/b><\/h3>\n<ul data-path-to-node=\"30\">\n<li>\n<p data-path-to-node=\"30,0,0\">Develop a complete <b data-path-to-node=\"30,0,0\" data-index-in-node=\"19\">BEP<\/b> for a real-world project.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"30,1,0\">Establish a professional <b data-path-to-node=\"30,1,0\" data-index-in-node=\"25\">CDE<\/b> system.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"30,2,0\">Apply <b data-path-to-node=\"30,2,0\" data-index-in-node=\"6\">ISO 19650<\/b> standards within an active project.<\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"30,3,0\">Ability to manage a multi-disciplinary BIM team.<\/p>\n<\/li>\n<\/ul>\n<hr data-path-to-node=\"31\" \/>\n<h3 data-path-to-node=\"32\"><b data-path-to-node=\"32\" data-index-in-node=\"0\">\ud83d\udd25 Added Value<\/b><\/h3>\n<p data-path-to-node=\"33\">This level qualifies you for the following roles:<\/p>\n<ul data-path-to-node=\"34\">\n<li>\n<p data-path-to-node=\"34,0,0\"><b data-path-to-node=\"34,0,0\" data-index-in-node=\"0\">BIM Coordinator<\/b><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"34,1,0\"><b data-path-to-node=\"34,1,0\" data-index-in-node=\"0\">BIM Manager<\/b><\/p>\n<\/li>\n<li>\n<p data-path-to-node=\"34,2,0\"><b data-path-to-node=\"34,2,0\" data-index-in-node=\"0\">Digital Construction Engineer<\/b><\/p>\n<\/li>\n<\/ul>\n<p data-path-to-node=\"35\">It provides a true understanding of how to implement BIM within <b data-path-to-node=\"35\" data-index-in-node=\"64\">Mega Projects<\/b>, moving beyond software usage to full-scale strategic management.<\/p>\n<\/div>\n<\/div>\n","protected":false},"author":12,"featured_media":17021,"template":"","course_category":[45,82,41],"class_list":["post-16671","courses","type-courses","status-publish","has-post-thumbnail","hentry","course_category-architectural-engineering-en","course_category-bim-en","course_category-civil-engineering","infinite-scroll-item","no-featured-image-padding"],"acf":[],"_links":{"self":[{"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/courses\/16671","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/courses"}],"about":[{"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/types\/courses"}],"author":[{"embeddable":true,"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/users\/12"}],"version-history":[{"count":19,"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/courses\/16671\/revisions"}],"predecessor-version":[{"id":34568,"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/courses\/16671\/revisions\/34568"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/media\/17021"}],"wp:attachment":[{"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/media?parent=16671"}],"wp:term":[{"taxonomy":"course_category","embeddable":true,"href":"https:\/\/esi.edu.sa\/en\/wp-json\/wp\/v2\/course_category?post=16671"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}